Dacon Completes Quality Beverage Design

Quality Beverage headquarters

Taunton, MA –  Dacon Corporation has completed the design, engineering and construction of a $1.8 million warehouse expansion at Quality Beverage’s headquarters in Myles Standish Industrial Park.

Currently, the Taunton office employs 125 people servicing a portfolio spanning traditional beers such as Anheuser-Busch to craft superstars like Wormtown.

In August, the firm purchased Williams Distributing in Chicopee, growing both geographic and product volume to 9.7 million case equivalents across three warehouses and 3,400 retail accounts within 130 cities.

This is Dacon’s third endeavor with Quality Beverage, previously renovating its Auburn distribution center and completing a $4.6 million rebranding of the Taunton location.

This project consists of a ground-up, 10,500sf warehouse addition to the south side of Quality’s headquarters facility. Designed to match the existing facades and accommodate future equipment upgrades, this high-stud warehouse maximizes vertical space on the property.

Serviced by one tailboard loading dock, the building’s main electrical transformer required a relocation to make room for the addition.

Dacon also provided insulation upgrades to existing warehouse space, which allowed for an additional climate-controlled storage area.