Corporate Retail/Hospitality

McDonald Completes LEGOLAND Center

Lego_122

LEGOLAND

Somerville, MA – McDonald Electrical Corp., based in Hingham, recently completed the electrical fit-out of LEGOLAND Discovery Center’s first New England family entertainment center, at Assembly Row Mall in Somerville. The project entailed developing electrical installation plans based on a generic design narrative.

McDonald coordinated and created drawings for the installation of multiple electrical systems and utility services at the 44,000sf retail location and installed a 1,200 amp secondary electrical service for the two-story LEGOLAND retail facility.

Unique features of the build-out included electrical installations of multiple amusement park rides, a 4D theater, special interactive gaming areas, and a retail store.

The project also required installation of an extensive lighting package and state-of-the-art lighting control installations.

The project team included architect, Darlow Christ Architects of Cambridge; GC, Lee Kennedy Company, Inc. of Quincy; and EE, Cosentini Associates of Cambridge.