CUBE 3 Begins Reno for Med Ctr

CUBE 3 Studio announced that demolition work for the Boston Medical Center Preston Building – fifth floor renovations will begin in January of 2010.

Boston, MA – CUBE 3 Studio announced that demolition work for the Boston Medical Center Preston Building – fifth floor renovations will begin in January of 2010.

This 7,000sf  BMC Foot Care Vascular and Endovascular Suite is a gut renovation of the Preston Building fifth floor, allowing a doubling of the existing space.
The design features a racetrack corridor that opens up across the suite allowing better visibility and communication across the suite, in addition to taking advantage of the abundant natural light at the continuous glass exterior walls. The new design includes an expanded waiting room, a dozen exam rooms, a physician’s reading room, fellows, orthotics workrooms patient and staff toilets, plus support spaces for clean, secure and soiled storage. Coordination of MEP/FP systems was a challenge due to existing structure being located only 8′ 2″ above the finished floor level.