Retail/Hospitality

MEC Completes Electrical Fit-Out of Roche Bros. Supermarket

View of Burnham Building in the evening

View of Burnham Building in the evening

Hingham, MA – McDonald Electrical Corp. (MEC), of Hingham, Mass., has completed the comprehensive electrical fit-out of the Roche Bros. store at the Burnham Building, the site of the former flagship Filene’s store at 10 Summer Street in Boston’s Downtown Crossing. The NECA contractor started construction on the 25,000sf, two-level store in September 2014, and the fast-track project was completed as scheduled in April.

The full-service supermarket is located on the basement level, occupying the former iconic Filene’s Basement space. At street level, Roche Bros.’ 3,000sf space features freshly prepared, ready-to-eat food, complete with a cookie oven and coffee bar.
McDonald Electrical supervised a field crew ranging upwards of 14 electricians and technicians based out of IBEW Local 103 at peak construction. McDonald’s tel/data division, MEC Systems, provided tel/data and security wiring for the project.
Roche Bros.’ first downtown Boston store opened on April 29. The supermarket is the 21st store for the Wellesley-based Roche Bros. chain.